Electrical Lockout/Tagout Checklist

  • Print this article
OSHA requires an electrical panel be locked and tagged before maintenance is performed.
OSHA requires an electrical panel be locked and tagged before maintenance is performed.

The Occupational Safety and Health Administration (OSHA) has a lockout/tagout program that outlines the procedures required for electrical maintenance safety. Lockout and tagout is the safety process a maintenance person uses to secure the electrical control panel on industrial equipment such as production presses and assembly machines. The program is designed to prevent the unexpected startup of electrical machinery or equipment during maintenance or repairs. Standard 29 of the Code of Federal Regulations 1910.147 describes the common procedures or checklist used for lockout/tagout.

  1. Notification

    • Before any lockout/tagout procedure begins, the electrician performing the maintenance notifies all affected employees that the machinery will be turned off and secured. Those employees include the machine operator, department foreman, maintenance supervisor and any other employee that will be affected by the shutdown. Notification is also performed before the machinery is placed back into service.

    Inspection

    • The employee authorized to lockout and tag the machinery inspects all locking devices for damage. If any damage is found, the employee must discard the device and replace it.

    Locking

    • Once all the preliminaries are performed, the authorized employee locks and/or tags the device out. After securing the energy source, the employee attempts to start the machine. Only after it's determined that the machine is de-energized can maintenance begin on the equipment.

    Tags

    • The lockout/tagout identification must have certain information provided to ensure everyone knows who locked the machinery, when the machinery was locked, time the machinery was locked, reason the machinery was locked and the supervisor of the authorized employee locking out the machinery. The tag is placed on the electrical panel and a lock secures the panel. Only the person who placed the lock and tag on the electrical panel or his immediate supervisor has the authority to remove the lock and tag.

    Restart

    • After all repairs are made to the machinery, the authorized employee can place the equipment back into production. Part of the lockout/tagout checklist includes the proper procedures to accomplish this task. The first step in the startup procedure is to ensure no tools are left in or around the machinery. Another review is performed after notification of restart, just to double-check that no tools or equipment were left behind.

    Safety Guard

    • After all tools have been removed, the authorized employee checks all safety guards and devices to make sure they have been put back in place. Each safety device on the machine must be inspected and verified that it's in the proper place.

    Removal

    • After all the previous steps have been followed, the authorized employee removes the locking devices and/or tagging. The power is turned back on, and the equipment is placed back into production. Some maintenance departments require the personnel to remain with the machine to ensure that it is operating properly.

Related Searches

References

  • Photo Credit Thinkstock/Comstock/Getty Images

Comments

You May Also Like

  • OSHA Lockout Procedures

    Periodic maintenance and repair is required on virtually all electrical equipment. Specific ways of performing lockout procedures vary in accordance with the...

  • Lockout/Tagout Compliance Checklist

    The Occupational Safety and Health Administration -- OSHA -- has established a standard for The Control of Hazardous Energy, a lockout and...

  • OSHA Requirements for Lockout Tagout

    OSHA standards stipulate that workers must use lockout/tagout (LOTO) procedures to prevent access to hazardous energy, ... Electrical Lockout/Tagout Checklist.

  • Standard Operating Procedures for Lockout Tagout

    After the electrical work is performed and before a lock is removed from a disconnect, ... Lockout-Tagout Procedures in the Manufacturing Industry.

  • Written Lock Out Tag Out Procedures

    Lock out/tag out procedures are designed to prevent injury to workers who deal with ... Standard Form for Lock Out Tag Out...

  • OSHA Standards for Electrical Panel

    Electrical panels installed and serviced in Canada must meet the standards of the Canadian Electrical Code and federal Occupation ... Electrical Lockout/Tagout...

  • Standard Form for Lock Out Tag Out Procedures

    Standard Form for Lock Out Tag Out Procedures. Electrical equipment, heavy machinery, ... Lockout-Tagout Procedures in the Manufacturing Industry.

  • Electrical Commissioning Checklist

    Electrical Lockout/Tagout Checklist. Definition of Equipment Commissioning. Featured. You're Allergic to What?! by Mom.me. Check It Out. 20 Secrets to Fat Loss....

  • OSHA Lockout Regulations

    Lockout/tagout regulations were put into place by the Occupational Safety and Health Administration (OSHA) to protect workers from the risk of injury...

  • Lockout/Tagout Training Programs

    OSHA offers training on proper locking and tagging of electrical equipment on its website.

  • Forklift Lock Out Tag Out Procedures

    Standard Form for Lock Out Tag Out Procedures. Electrical equipment, heavy machinery, computers and devices that emit energy are prone to breaking...

  • Electrical Inspection Check List

    Electrical inspections are performed by licensed, bonded and insured electricians to make sure that residential and commercial wiring is safe. Specific checklists...

  • Lockout/Tagout Policy & Procedures

    Lockout/Tagout Compliance Checklist; Comments ... Lock out/tag out procedures are designed to prevent injury to workers who deal with electricity, natural gas,...

  • OSHA Electrical Safety Training

    OSHA Electrical Safety Training. ... A lockout or tagout is generally accomplished by locking the circuit breaker in the "open" position with...

  • Lock Out Tag Out Instructions

    The lockout tagout tags must be legible and contain words such as "Do Not Start," "Do Not Open," "Do Not Operate" or...

  • How to Use a Lockout/Tagout Lock Box

    When a single construction crew is working on a piece of equipment, a single lockout/tagout lock secures the equipment's electrical disconnect switch....

  • Lockout-Tagout Procedures in the Manufacturing Industry

    Standard Form for Lock Out Tag Out Procedures. Electrical equipment, heavy machinery, computers and devices that emit energy are prone to breaking...

  • Safety Lockout Procedures

    Electrical Lockout/Tagout Checklist; How to Use a Lockout/Tagout Lock Box; Comments You May Also Like. OSHA Lockout Procedures. OSHA Lockout Procedures.

  • Electrical Safety Inspection Checklist

    Electrical Safety Inspection Checklist. ... Electrical Inspection Checklist; Photo Credit Fuse panel image by Charlie Rosenberg from Fotolia.com; More Like This.

Related Ads

Featured
View Mobile Site