To keep concrete in place while it sets, the forms must be designed to withstand the concrete's pressure. The American Concrete Institute (ACI) recommends several formulas for calculating the pressure of concrete as it is poured. You will need to evaluate the temperature of the concrete (T), the rate of pour in cubic feet per hour (R), the weight of the concrete (W), the unit weight coefficient (Cw), the chemistry coefficient (Cc) and the height to which you are pouring the concrete (H).

  • Open Microsoft Excel and create a new workbook. Create the headings across the top in separate columns: "Maximum Pressure" "Cw" "Cc" "R" "T" "W" and "H."

  • For a columns and walls less than 14 feet high enter the following formula in the cell under "Maximum Pressure" (which should be B1) without quotation marks: "=B2C2(150+9000(D2/E2))" This will yield the result of the ACI recommended formula: "Pmax = CwCc[150+9,000*R/T]"

  • Enter the values for Cw, which is the weight of your concrete in pounds per cubic foot divided by 145 pounds per cubic foot. Typically concrete will be between 145 and 150 pounds per cubic foot, so Cw will usually be 1. Enter the value of Cc, which is based on the blend and composition of your concrete. Standard concrete has a Cc of 1, but if retarders are added it may rise to 1.2 or if you use a "blend containing more than 70% slag or 40% fly ash" the Cc may be as high as 1.4. . Enter the rate of pour (R) in feet per hour. Enter the temperature (T) in degrees Fahrenheit. Enter the weight (W) of the concrete in pounds per cubic foot and enter the height (H) of the concrete pour in feet.

  • Change the formula in cell B2 if your concrete will be poured over 14 feet high and at a rate less than 15 feet per hour. Enter (without quotes): "=B2C2((150+43400/E2)+(2800(D2/E2)))" If the rate is over 15 feet per hour change the formula to: "=F2G2" without quotation marks.

Related Searches

References

  • Photo Credit Jupiterimages/Photos.com/Getty Images
Promoted By Zergnet

Comments

You May Also Like

  • Concrete Formula

    The words cement and concrete are used interchangeably by laypeople who do not work with them on a daily basis. And, in...

  • How to Build a Formwork for Concrete

    Concrete projects such as patio building need a good form to hold the concrete as its poured. The most common form type...

  • How to Clean Concrete With a Pressure Washer

    Cleaning concrete with a pressure washer is one of the easiest types of work you can do with a pressures washer. Almost...

  • How to Design Falsework and Formwork

    Formwork, also known as falsework, refers to the temporary structures in place to cast concrete building elements. Formwork is required for most...

  • How to Design Formwork

    Formwork is used in construction to create a mold into which concrete will be poured. The formwork gives the concrete a place...

  • DIY: Concrete Calculator

    A do-it-yourself project can always be rewarding when you get the job done and the results are good. And with all the...

Related Searches

Check It Out

22 DIY Ways to Update Your Home on a Small Budget

M
Is DIY in your DNA? Become part of our maker community.
Submit Your Work!