How to Run Conduit Before Pouring Concrete

eHow may earn compensation through affiliate links in this story. Learn more about our affiliate and product review process here.

Things You'll Need

  • Chalk line

  • Shovel

  • Rake

  • Hand tamper

  • PVC conduit

Installing conduit under slabs provides a path for electrical wires to travel.

The best time to run conduit is before your pour the concrete slab. This allows you to install the conduit under the slab in a location where it is well protected. PVC conduit is typically used for these applications because it is weather-tight and doesn't corrode due to exposure to the acidic concrete. Installing conduit one size larger than you need is wise to accommodate future expansion of the electrical system.

Advertisement

Step 1

Chalk a line from the start of the conduit run to the end by holding the chalk line tight between the two points and snapping it with your fingers.

Video of the Day

Step 2

Remove 3-5 inches of gravel along the chalk line with a shovel. Remove any large rocks and keep the base of the trench level.

Advertisement

Step 3

Lay the PVC conduit in the trench from the start of the run to the end.

Step 4

Fill the trench back in with the material removed. Rake the ground as flat as possible.

Step 5

Tamp the ground along the conduit with a hand tamper. Be careful not tamp so hard that it breaks the conduit.

Tip

Never use a mechanical tamper over conduit. The strength of this style of tamper will break the pipe.