How do I Install Temporary Lighting for a Job Site?

Save

Temporary job site lighting provides construction workers with a safe work environment. A job site's temporary lighting must meet the National Electrical Code (NEC) requirements. Temporary lighting must use ground-fault circuit interrupting (GFCI) receptacles when plugged into a temporary electrical-service panel's outlets. The NEC also requires removal of all temporary lighting and its wiring after completing the job. This includes wires run through walls. Holiday and seasonal job sites must disconnect the temporary lighting after 90 days.

Things You'll Need

  • String light
  • Plastic zip ties
  • 100 watt light bulb
  • GFCI protected electrical outlet
  • Extension cord
  • Stretch out a string light from the farthest point away from the power supply to the power supply. Lay the string light on the floor. A string light has several light fixtures molded into a wire at 10-foot intervals. Each light fixture uses a metal or plastic cage to protect a light bulb. Typical string lights stretch out to either 100- or 50-foot lengths.

  • Inspect the area above the string light. Do not route the string light through areas without a roof. When possible, place the string lights near the center of each room.

  • Hang the string light to a roof truss or another type of structural support with plastic zip ties. Start at the end farthest from the power supply and space a plastic zip tie every five feet. Lift the string light to the truss then wrap a zip tie around the truss and the sting light. Slide the zip tie's tag end into its fastener and pull on the tag end.

  • Screw a 100 watt light bulb into each light socket. After screwing in the light bulb, close the string light's cage. Plastic cages snap together. Metal cages use a small latch to hold the cage together.

  • Inspect the temporary electrical-service panel for a GFCI protected circuit breaker or outlet. A GFCI monitors the electric current leaving and returning from it. If it notices a drop in the amount of current returning, then the GFCI trips. If the electrical-service panel does not use a GFCI circuit breaker or outlet, then replace one of the common electrical outlets with a GFCI protected outlet. Dedicate that outlet to the temporary lighting system.

  • Plug the string lights into a GFCI protected outlet. If the string lights do not reach the electrical-service panel, then stretch an extension cord from the electrical outlet to the string light's plug. Secure the extension cord to the building's trusses with plastic zip ties every five feet.

Related Searches

References

  • Photo Credit construction light image by EvilGirl from Fotolia.com
Promoted By Zergnet

Comments

Resources

You May Also Like

  • How to Install Temporary Lighting

    Installing temporary lighting is easy and simple, whether it be in your attic or on a construction site. Most temporary light strings...

  • How to Hang String Lights Indoors

    String lights come in all different colors and sizes, making them a wonderful decorating option for many different occasions. You can hang...

  • How to Install a Temporary Electric Meter

    Temporary electric meters at construction building sites allow workers to run their power tools. Connecting the feed wires to temporary meter boxes...

  • Temporary Electric Pole Specifications

    Temporary electric poles are typically used to safely provide electric power outlets at a construction site. When construction is finished, the temporary...