How to Correct a Concrete Slab That Was Poured Without a Vapor Barrier

Save

Vapor barriers are put in place to control the amount of moisture that can enter a building space. By decreasing the moisture content of the air you decrease the amount of mold-related infestations. You also increase the energy efficiency of the house by lessening the air exchange between the exterior and interior of the building. It is not uncommon that in the speed of building the inclusion of a vapor barrier is overlooked (it is commonly specified in the notes of the plan set and not on the actual page of the plan you are working on). To correct a concrete slab that was poured without a vapor barrier you can apply an effective liquid vapor barrier coating to the top surface of the slab. This isn't your call however, you must get approval from the engineer and building inspector before starting this process.

Things You'll Need

  • Broom
  • Liquid vapor barrier
  • Paint tray
  • Paint roller
  • Fine foam roller pads
  • Plastic vapor barrier (if needed)
  • Vapor barrier tape (if needed)
  • Sweep the top of the concrete slab clear of all debris.

  • Open your liquid vapor barrier product and pour it into a roller paint tray just as you would pour regular paint into the tray.

  • Place a new fine foam roller pad over your paint roller by pushing it onto the roller frame (the roller pads are made on hollow tubes that slide over the roller frame).

  • Roll the paint roller into the liquid vapor barrier in the paint tray so the entire pad is covered. Roll the roller pad on the high sloped part of the tray (with the molded ribs) to spread the liquid vapor barrier evenly throughout the foam of the roller pad.

  • Apply the liquid vapor barrier to the concrete slab. Work from one corner out to the edge of the slab making sure that you apply the barrier evenly and that you do not miss any spots. Wait 5 to 6 hours for the barrier to dry and then apply another coat and let dry for 12 hours. The final coat needs longer to dry because it is not being absorbed into the concrete but sitting on top of the prior barrier coating.

Tips & Warnings

  • If you are going to install flooring over the top of your concrete slab you can also lay down a plastic vapor barrier over the top of the concrete slab. Make sure that any overlapping pieces of the barrier are sealed together with vapor barrier tape. Add any venting required (see your building plans for this information) into the flooring support (i.e. furring strips placed under the supporting substrate of the finished floor) before installing the flooring.
  • Never assume the responsibility of deciding the method for correcting a concrete slab that was poured without a vapor barrier. While your decision may be right, you must have the method authorized and approved by the Engineer of Record for the project and the Building Inspector (both in writing) or your solution may be rejected.

References

  • Photo Credit paint roller image by Ana de Sousa from Fotolia.com
Promoted By Zergnet

Comments

Resources

You May Also Like

Related Searches

Check It Out

22 DIY Ways to Update Your Home on a Small Budget

M
Is DIY in your DNA? Become part of our maker community.
Submit Your Work!