How to Attach Paneling to Basement Walls

Save

Concrete block or poured concrete basement walls require a different approach when attaching paneling. Use wood framing as a foundation to attach the paneling on unfinished walls, or attach paneling directly to previously finished basement walls.

Things You'll Need

  • For previously finished walls:
  • Hot soapy water
  • Cleaning cloth
  • Paneling glue
  • Panel nails
  • Paneling
  • Hand or circular saw
  • For unfinished concrete block or poured concrete walls:
  • Concrete block sealant or waterproofing
  • Paintbrush
  • Roller
  • Paint tray
  • Painter’s tape
  • Vapor barrier
  • Spray adhesive for vapor barrier
  • Fir strips or 2x4s
  • Tapcon or other concrete nail

Previously Finished Walls

  • Finished basement walls, such as those with painted drywall or wallboard, do not require much preparation to attach paneling. Wash the walls with hot, soapy water to remove soil that will reduce the adherence of the glue used to attach paneling to the walls. If drywall or wallboard has been put on the walls, but have not been painted, do not wash the walls.

  • Glue paneling to finished walls. Apply the glue in a zig-zag pattern on the back of the paneling. Apply glue 3 inches from all four edges. Use a level to check that the edge is plumb and press against the wall. Use a rubber mallet to tap the paneling in place. Pound a panel nail in each corner to hold the paneling in place while the glue dries.

  • Cut paneling to fit around outlets, windows or other obstructions. Cut it face down with a radial saw or face up with a hand saw.

Unfinished Concrete Block or Poured Concrete Walls

  • Unfinished concrete block or poured concrete walls require preparation for paneling. Basement walls easily become damp so apply a sealant or high-quality waterproofing coating to the walls.

  • Apply painter’s tape to any areas that are adjacent to the basement wall.

  • Apply the sealant or waterproofing to the concrete block or poured concrete walls with a paintbrush and roller. Use a paintbrush to create a 3-inch border of sealant or waterproofing, also called "cutting in," around the edges and obstacles such as windows or outlets. Use a paint roller to paint all large surfaces. Allow to dry thoroughly according to the manufacturer's directions stated on the sealant or water-proofing product.

  • Install the plastic vapor barrier with a spray adhesive. Avoid punctures in the plastic since holes will degrade the function of the vapor barrier.

  • Use fir strips or 2x4s to frame the area. Use Tapcon or other screws designed specifically for concrete block and poured concrete to attach the chosen framing.

  • Install the vertical framing 16 inches apart on center. This means that there should be 16 inches from the center of one framing fir strip or 2x4 to the center of the next fir strip or 2x4. Install horizontal framing at the top, center and bottom of the area.

  • Check each framing board with a level to ensure that the board is plumb. If not, place shims behind the board to shim it so it is plumb. Cut pieces for around outlets, ventilation ducts, windows or other obstructions.

  • Attach the paneling with panel nails. Install one nail every 12 inches along the edges and every 16 inches on centers. When attaching the paneling to framing around windows, outlets or other areas, install panel nails every 3 to 5 inches.

Tips & Warnings

  • Preparation is the key to a professional-looking paneling project. The paneling must be plumb and straight so there are not waves in the finished project.
  • Use caution when using adhesives. Use only in a well-ventilated area to avoid a buildup of toxic fumes.
  • Wear safety glasses or goggles while working.

References

  • Photo Credit Hemera Technologies/AbleStock.com/Getty Images
Promoted By Zergnet

Comments

You May Also Like

Related Searches

Check It Out

22 DIY Ways to Update Your Home on a Small Budget

M
Is DIY in your DNA? Become part of our maker community.
Submit Your Work!