How to Calculate Excavator Bucket Capacity

The bucket capacity required for a job depends on the hourly production requirement, the density of the material, how full the bucket can be loaded for a particular type of material, called the "fill factor," and the cycle time. The hourly production requirement is set by project management. The number of tons of material per square yard is taken from standard reference tables. Cycle time is the time between when a bucket is filled, and when it is filled again. The type of material is crucial, since that determines the weight per cubic yard and the fill factor varies by bucket manufacturer. Does this Spark an idea?

Things You'll Need

  • "The Building Estimator's Reference Book"
  • Fill factor data sheet
  • Stopwatch
  • Calculator
Show More

Instructions

    • 1

      Read the excavating project specifications to determine the nature of the material to be moved. Determine the material weight from a standard reference table, such as the "Weights Of Building Materials, Agricultural Commodities, and Floor Loads For Buildings" produced by Penn State University or "The Building Estimator's Reference Book." If the material to be moved is crushed stone, the Building Estimator's Reference Book says crushed stone weighs 2,500 lbs. (1.25 tons) per cu. yd. If the material is crushed stone, look up "crushed stone" on the Fill Factor Data Sheet provided with the bucket. The fill factor will specify, as a range, how fully the bucket should be loaded with that material. If the bucket should be loaded not more than 85 percent full with crushed stone, that's the Fill Factor for that material in that bucket.

    • 2

      Time a loading operation with a stopwatch. Start timing when the excavator bucket begins to "dig in" and stop timing when the bucket again begins to dig in. Divide 60 by the cycle time to learn the number of cycles per hour. If the cycle time is .5 minute, 60 / 0.5 = 120 cycles per hour.

    • 3

      Divide the hourly production requirement by the cycles per hour with your calculator. If management requires 800 tons to be moved per hour, and the machine and operator average 120 cycles per hour, then 800 / 120 = 6.67 tons moved per cycle.

    • 4

      Divide the per cycle payload (6.67 tons) by the material density (1.25 tons/cu. yd.) to determine the nominal bucket capacity: 6.67 / 1.25 = 5.28 cu yds.

    • 5

      Divide the nominal bucket capacity by the fill factor to find the required bucket capacity: 5.28 / 0.85 = 6.21 cu. yds.

Related Searches:

References

Resources

Comments

You May Also Like

  • Specifications for Caterpillar Excavators

    Caterpillar is a popular excavator manufacturer. They have manufactured dozens of different types of excavators over the years including the 315CL, 320CL...

  • Excavator Bucket Types

    Excavator Bucket Types. Buckets, the most popular excavator attachment, dig and carry dirt, rock, or building materials on construction projects, demolition sites...

  • Kindergarten Capacity Measurement Activities

    Lessons in capacity can be made fun for kindergartners, especially if they are measuring something they enjoy. Educators can use a variety...

  • How to Calculate Excavator Productivity

    The methodology of calculating the productivity of an excavator emerged together with the first excavator machines. Essentially, excavator productivity is typically ...

  • Case Backhoe Specs

    A backhoe is a type of digger, an excavating vehicle. Also known as a rear actor or back actor, a backhoe consists...

  • Specifications of the Kubota Mini Excavator

    Specifications of the Kubota Mini Excavator. Kubota Corporation is a manufacturer of heavy landscape equipment, construction equipment and agricultural equipment ...

  • How to Hoist With a Backhoe Bucket

    Farmers and individuals performing small-scale construction projects prefer backhoes, the smaller, less formidable offspring of the bulldozer, for their versatility ...

  • How to Make Backhoe Buckets

    Excavation is a tough job that requires big tools and machinery, including the backhoe bucket. The machine is available from the market...

Related Ads

Featured