Things You'll Need:
- hammer, scraper, smoothing brush, sharp cutting tool
-
Step 1
Prep walls by correcting imperfections. Patch all holes as needed before applying any coatings. Mix all materials as required by the manufacturer and the proper temperture of atleast 70 degrees on the exterior as well as the interior.
-
Step 2
Drive nail heads atleast 1/16 of an inch in walls for filling with spackle or joint compounding and sanding to a smooth finishing for application of all coatings. Fill cracks with compound where needed and or where there are large cracks use tape to cover them. In some cases dry wall is necessary for larger areas.
-
Step 3
Prime and sand all new work before applying any finish coat. Primer must be completely cured before applying any second or finish coat or coats. Oil coats may take up to forty eight hours or more, depending on weather or temperture conditions. Top coats must match under coats for the proper curing and adhesion of all materials.