Step1
A innovative company has a new strategy to remove all of the barriers to solar generated energy. This solar equipment manufacturer is offering a solar energy unit to American homeowners on a rental basis. No need to purchase a system outright any longer. Unless, you have the means, where-with-all, and wish to maintain the system yourself. If you want to go solar, go now. The environment needs it.
This solar panel rental idea is probably not new. But, it still is blowing many people away with the simplicity of the concept. It seemed like this was too good to be true or something. Like most paradigm shifts, this company's model is so straight forward it makes you think - "why has no one thought of renting solar panels and related equipment before".
However, there are some restrictions, not everyone will qualify, AND there is a long waiting list of potential solar system renters. The good news is the process to get your home evaluated for a solar unit is pretty clear. The following "How-to" guide documents what the average homeowner needs to do to be considered for a solar system installation.
Step2
Site Evaluation & Review:
The energy audit, solar energy system design, and the installation & construction process start with the site/home review of the residence performed by one of the company engineers. During this site review, the engineer will take measurements of the lot, home layout, take notes of the roofing materials & condition, the roof orientation to the sun, and assess the present shading factors and those that may build up over time; like the growth of trees or new additions to the property.
The solar engineer will also take the time to explain to the homeowner what will be occurring in the weeks to come, and what to expect from the solar energy system as it comes online. If the homeowner has any questions about anything during the site review, the engineer is the one to ask when they are on site.
Step3
Home Solar Power Design & Rental Approvals:
Once the site-review is completed, the solar engineer will design a system that both fits the home's layout and meets as much of the homeowners electrical needs as possible. It should be noted that due to certain shading factors, roof orientations, and physical roof space, the system may not be able to accommodate the total energy needs of the homeowner. The rented unit may in fact only provide a portion of a particular location's energy needs. This is an important consideration and highlights the need for energy auditing and overall energy conservation on behalf of the homeowner. The company will still install and rent out the solar energy system but it will not guarantee that the unit will allow the homeowner to self-generate 100% of their energy needs.
The actual system design is presented to the homeowner at the conclusion of the site review. The can then approve of the plan & the general system design. If there is any discrepancy or concerns with the design, the homeowner is encouraged to bring these to the attention of the solar engineers. A proper question and answer session included during the site evaluation.
Step4
Solar Panel Rental & The Solar Unit Security Deposit:
Following the design approval, the homeowner is asked to pay a security deposit for the solar system installation. This deposit is 100% refundable with interest at the end of the rental term. The security deposit is merely intended to act as a deterrent related to abusive activities or for those wishing to move the system to new locations more than once.
After collecting the deposit, the engineer will work on the appropriate permits, apply for any utility interconnection agreements, and submit appropriate paperwork to county permitting offices. This whole process may take a few weeks, but at the conclusion, the team of installation technicians will be prepared to have the system installed.
Step5
Solar Energy System Installation & Maintenance:
Once the permitting paperwork is in order, the installation team will contact the homeowner directly to set the solar system installation date. The installation technicians will then install the solar panels and prepare the unit for final inspection by the local permitting office. Once the local county and utility representatives have inspected the installation, the homeowner is ready to begin taking advantage of flat-rate solar system rental, a more reliable energy service, and a source of 100% clean, solar energy.
Comments
grouch said