Design and Placement
Step1
Study the area. You may need to do a traffic study to determine the best place to build your bridge. In most cases you will be crossing a wide area such as a large river or small bay. Bore holes to determine the makeup of the soil under the waterway.
Step2
Determine the materials you will use for construction. Steel cables and pillars with poured concrete bases are most commonly used.
Step3
Obtain survey data and draw construction drawings of the bridge. This will require a team of drafters, designers and structural engineers. The structural engineer will need to stamp the drawings to be approved by your local governing body.
Estimation and Bidding
Step1
Estimate the cost of the bridge building project. Obtain a copy of the construction drawings from the designing engineer and determine how much each item will cost in labor as well as materials.
Step2
Complete your itemized bid to build the bridge. Make sure you take into account all specifications and details, including typical section details and utility restoration.
Step3
Submit your bid to your governing authority. Most of the time, these are closed bids and the lowest bidder with the most complete itemization will win the bid.
Bridge Construction
Step1
Build the concrete forms for the pillars. These are placed in the waterway, connected and sealed to make a watertight form. Pump out the water and excavate to a solid base.
Step2
Pour the pillars and place anchor-bolts or other steel connectors into the concrete. This is where the tall steel poles will be placed.
Step3
Set your pre-cast towers on your concrete base and secure by the method detailed by the engineer. This will require a large crane and some other heavy construction equipment.
Step4
Thread cables through the pillars according to the engineer's specifications. Attach these to the decking as each bridge section is built, cantilever style. Many cable-stayed bridge designs allow for an adjustment to the tension on the cables, so one section is not supporting more weight than its neighboring cables, thereby weakening that cable and possibly causing catastrophic failure.
Step5
Prepare the terminal ends of the bridge. In building a cable-stayed bridge, the terminal ends are where the roadway meets the land. These ends are where the greatest tension on the cables are and don't need as much reinforcement as a beam bridge, for example. In fact, depending on the stresses, you might be "pulling down" the roadway, instead of "holding it up."
Step6
Pave the decking and enjoy your new cable-stayed bridge.